On the basis of the full investigation and in-depth analysis, the manufacturing procedures of the high-speed rail plate are optimized by means of the intelligennt calculation methods. The collaborative coordination between the manufacturing plants and the construction sites makes it feasible to work out the scientific yielding schemes in accordance to the cadence of the construction, the purposes of which are to save the enterprise resources, to lessen the labor loss, to reduce the storing cost and ultimately to promote the overall profits of the high-speed railroad construction.
For more information,please contact:
Prof.HU Hao
Tel.:86-21-62933091
Email:hhu@sjtu.edu.cn
Phone:86-21-34206196/34205291
E-mail:oceglobal@sjtu.edu.cn;
oce@sjtu.edu.cn